United States
Federal credit. State add-ons. The published cut is not the installer invoice.
-
Two Long Island batteries are switched off over a 2023 fire - New York regulators point at the fire suppressant, not the batteries
-
US commercial solar got 5.6% dearer in a year, to $1.77 a watt, even as module prices fell
-
Arizona's big utility booked a four-hour battery for twenty years - and the banks closed $220 million behind it
-
Google banked leftover solar in batteries so clean power showed up in the hours it actually used
-
US workplaces bought batteries in bulk last quarter. The install record was not only utilities.
-
Meta added a 144 MW Texas solar farm to its Apex deals, taking the green certificates while the grid gets the power
-
The US set final duties on solar cells from India, Indonesia and Laos, up to 249% combined for India
-
US commercial solar installs rose 11% in the second quarter while home solar hit a five-year low
-
Illinois approved 600 MW of new four-hour batteries, but the PJM zone got only 80 MW of its 588 MW target
-
A new US order on foreign grid equipment puts battery projects first in line for delays, BloombergNEF says
-
The US widened its block on new foreign-made grid inverters to cover wired connections, with a carve-out for 45X makers
-
New Jersey proposed paying home batteries for grid duty, and says business batteries at critical sites come next
-
Nevada's main utility signed for 25 years of solar with a four-hour battery: 400 MW of panels, 1,600 MWh of storage
-
Tesla filed plans for a $10.1 billion solar factory campus in Texas, with production from 2029
-
A 5.3-hour battery is going up next to Ohio's data centre cluster: 200 MW / 1.06 GWh, the biggest on the PJM grid
-
From 4 December, imported solar modules in the US carry a $0.38 per watt price floor plus a 15% tariff
-
Orsted switched on a 250 MW / 500 MWh battery beside a Texas solar farm, and runs it separately from the panels
-
Texas paused its data centre hook-up queue: 474 GW of requests, about 90% of them data centres
-
Costco took a Florida distribution centre off the grid with solar and batteries, and nobody said how big the system is
-
PJM wants new data centres that bring no power of their own to cut back first near a grid emergency
-
Tesla signed to buy about 1 TWh a year from an Arizona solar farm with a four-hour battery
-
Solar and batteries were 91% of new US power capacity in the first quarter, and California's batteries met 36% of demand at one point in July
-
Google booked the first two phases of America's largest solar-plus-storage build - and the box is part of the deal
-
The US solar tax credit's start-building deadline has passed, and late projects now race a December 2027 finish line