Storage desk

Storage

A battery is a box that holds lunchtime sun for the night shift. We do not invent your payback.

  1. CIMB pairs a battery with 20.2 GW of the 24.3 GW of new Peninsular solar on its 2026-2035 sheet - about RM1 million a megawatt for the battery and RM3 million for the panels

    29 Oct 2026

  2. Ontario caps an inverter plant at 75 MW on a 115 kV line in its next contract round - Belleville's list is 10 MW of solar and a 60 MW battery, and a local factory feeder is off the map

    29 Oct 2026

  3. A citrus farm with 22 power accounts is lining up 3 MWp of solar and a 6.6 MWh battery on one private line - the tariff is blank

    28 Oct 2026

  4. A Minas Gerais poultry farm is running 378 kWp of solar and a 1.29 MWh battery - the 50% bill cut is an estimate, and the diesel generator stays

    28 Oct 2026

  5. Google and Voltus added 1,070 MW of flexible PJM capacity - a workplace battery can join the pool, and the contract prints no payment rate

    26 Oct 2026

  6. A Czech industrial group signed a 20-year contract for power from 27 MW of solar and a 10 MW battery - the developer owns the plant, and the price is blank

    21 Oct 2026

  7. Dominion sketches 3.5 GW of grid batteries over 20 years - the April law tells that utility to seek 16,000 MW of shorter batteries and 4,000 MW of longer ones

    21 Oct 2026

  8. Ontario's draft lets a transmission battery sell energy, reserve and frequency control in the same hour - the pay formula is blank, and a factory feeder is out

    20 Oct 2026

  9. A Geelong campus is running a 100 kWh lead-acid battery - the Sydney factory copy is still a plan, 600 mm from the wall

    19 Oct 2026

  10. A La Fox factory plans a 5 MWh battery on site - ComEd's storage rebate is $300 or $250 a kilowatt-hour, and this project has not been paid it

    18 Oct 2026

  11. Croatia puts €30 million on the table for farm and food-plant solar and batteries - first in, first paid, from 9 November

    17 Oct 2026

  12. The grid couldn't give a Barcelona factory more power, so it bought a 3.87 MWh battery instead of waiting

    17 Oct 2026

  13. A Galway medical-device plant built a 6 MWh battery and 4 MW of generators around its solar - and the installer behind it now sells through Energia

    16 Oct 2026

  14. Honda Malaysia put 5.6 MWp of solar and a 5.8 MWh battery on its factory - and it still covers only about a tenth of the power bill

    16 Oct 2026

  15. A Woodstock car-parts factory put in a 3.6 MW battery for two hours of peak cut - financed by someone else

    15 Oct 2026

  16. US buyers now pay about 20% more for Chinese storage cells before tariffs - freight flipped the map

    15 Oct 2026

  17. A Riverwood factory warehouse put in a 200 kWh battery on a 50 kW inverter - four hours of push, and a A$15,000-a-year estimate

    14 Oct 2026

  18. A Vermont chip factory added about 6 MW of solar and a 16 MW battery - and the battery is the part that pays

    14 Oct 2026

  19. A Johor precast concrete factory put 573 kW of solar and a 522 kWh battery on site - about two hours of battery at full push, built in roughly three months

    13 Oct 2026

  20. France's biggest battery published its first report card - 145 full cycles in 125 days and 70.5 GWh fed back from a 240 MW / 480 MWh site

    13 Oct 2026

  21. Alberta's biggest battery is online - Northland's Jurassic box is 80 MW / 160 MWh, two hours at full power, with a 15-year offtake covering all of it

    12 Oct 2026

  22. European C&I battery shelves may get crowded into early 2027 - utility-scale prices look steadier

    12 Oct 2026

  23. NSW cleared a 125 MW / 1,000 MWh eight-hour battery near Narrabri - Energy Vault owns it, Enervest delivers, LTESA runs 14 years

    11 Oct 2026

  24. Germany's latest innovation auction went entirely to solar-plus-storage - 480 MW at an average €0.0514 per kWh

    10 Oct 2026

  25. JA put a 125 kW / 261 kWh solar-plus-battery cabinet on European pre-order - one box for panels, storage and 10 ms backup

    10 Oct 2026

  26. Two Long Island batteries are switched off over a 2023 fire - New York regulators point at the fire suppressant, not the batteries

    8 Oct 2026

  27. Three Spanish factories now run 62.5 MWh of batteries beside 34 MWp of solar - the first three of ten in a 366 MWh job

    7 Oct 2026

  28. A landlord with up to 240 offices, warehouses and clinics handed its roofs to an energy company - about 70 MW of solar and 300 MWh of batteries, with no capex for tenants

    6 Oct 2026

  29. Ireland puts money behind home batteries again from 6 October - and says businesses using the solar support can cut energy costs by up to €300,000 a year

    5 Oct 2026

  30. NSW's Waratah Super Battery hit final commercial ops - 850 MW on an old coal site, built to catch grid shocks in milliseconds

    5 Oct 2026

  31. A US tech company booked Malaysian firm solar for its data centres - 680 MW of panels and a four-hour battery, on a twenty-one year term sheet

    2 Oct 2026

  32. Queensland's wholesale power price fell 40% in a year - the state generator credits the battery build-out

    2 Oct 2026

  33. FRV just switched on a 100 MW two-hour battery in southwest Victoria - its first big standalone box in Australia

    1 Oct 2026

  34. A Victorian hybrid solar-plus-battery hub just hired its Stage 1 builder - Gamuda takes the Mortlake EPC

    30 Sep 2026

  35. Mayo just cleared a revised plan for an 80 MW four-hour battery next to an SSE gas station - FID is still SSE's call

    30 Sep 2026

  36. A Moroccan phosphate mine switched on a five-hour battery next to its solar - lunchtime sun for the night shift on the plant

    29 Sep 2026

  37. Spain will put a new capacity charge on power bills - and pay factories that can cut load when the grid is stressed

    29 Sep 2026

  38. Ireland will stop charging grid batteries like a factory when they fill up - from 1 October they pay the generator fee instead

    28 Sep 2026

  39. Amazon booked a four-hour Victorian battery without building it - Australia's first corporate storage toll outside the energy industry

    25 Sep 2026

  40. Greece put €8.15 million toward workplace batteries next to solar. Most of the programme budget is still sitting unused.

    24 Sep 2026

  41. Victoria's state utility bought into a long battery - and booked half its power for fifteen years for business customers

    24 Sep 2026

  42. Arizona's big utility booked a four-hour battery for twenty years - and the banks closed $220 million behind it

    23 Sep 2026

  43. Croatia signed 47 business battery grants worth EUR 16.3 million, using only about 30% of the money on offer

    23 Sep 2026

  44. Malaysia publishes a fixed grid fee for corporate solar that can deliver for four hours

    23 Sep 2026

  45. A German steel mill bought solar - and the right to run the batteries when the plant needs power

    22 Sep 2026

  46. Google banked leftover solar in batteries so clean power showed up in the hours it actually used

    22 Sep 2026

  47. Australia switched on its first eight-hour grid battery. It fills up at noon and runs into the night.

    21 Sep 2026

  48. US workplaces bought batteries in bulk last quarter. The install record was not only utilities.

    21 Sep 2026

  49. Canberra’s small-scale battery discount stops at 100 kWh. NSW’s workplace voucher goes to 30 MWh.

    19 Sep 2026

  50. Ireland will help pay for workplace solar panels. The battery is a separate bill.

    18 Sep 2026

  51. NSW will knock money off a workplace battery. The published cut is a range. Your quote is a different number.

    18 Sep 2026

  52. A Croatian oil factory switched on 3.5 MW of solar and a 4.5 MW / 9 MWh battery - self-use first, surplus into the box

    16 Sep 2026

  53. If the lights are still on after sunset, a battery is how lunchtime sun works the night shift.

    15 Sep 2026

  54. Croatian power traded below zero at Sunday lunchtime, while neighbours' evening prices passed EUR 225

    6 Sep 2026

  55. Croatia's first home battery grant filled in about a day: 9,320 applications, 1,460 for batteries

    4 Sep 2026

  56. Illinois approved 600 MW of new four-hour batteries, but the PJM zone got only 80 MW of its 588 MW target

    3 Sep 2026

  57. A new US order on foreign grid equipment puts battery projects first in line for delays, BloombergNEF says

    1 Sep 2026

  58. Croatia lets standalone batteries get permits in industrial zones before local plans catch up

    28 Aug 2026

  59. The US widened its block on new foreign-made grid inverters to cover wired connections, with a carve-out for 45X makers

    24 Aug 2026

  60. New Jersey proposed paying home batteries for grid duty, and says business batteries at critical sites come next

    19 Aug 2026

  61. Nevada's main utility signed for 25 years of solar with a four-hour battery: 400 MW of panels, 1,600 MWh of storage

    18 Aug 2026

  62. Dubrovnik airport plans solar roofs over its car parks and a 3.3 MWh battery, with no power sold to the grid

    11 Aug 2026

  63. Vukovar's water company is building solar with a battery at its wastewater plant and expects over EUR 300,000 a year off power costs

    11 Aug 2026

  64. A 5.3-hour battery is going up next to Ohio's data centre cluster: 200 MW / 1.06 GWh, the biggest on the PJM grid

    7 Aug 2026

  65. Orsted switched on a 250 MW / 500 MWh battery beside a Texas solar farm, and runs it separately from the panels

    6 Aug 2026

  66. HEP confirmed its Sukosan solar plant comes with a battery of up to 200 MWh, and the estimate rose to EUR 65 million

    5 Aug 2026

  67. Costco took a Florida distribution centre off the grid with solar and batteries, and nobody said how big the system is

    28 Jul 2026

  68. Tesla signed to buy about 1 TWh a year from an Arizona solar farm with a four-hour battery

    28 Jul 2026

  69. Croatian power traded below zero for 257 hours last year, and the regulator reads it as a case for batteries

    23 Jul 2026

  70. Solar and batteries were 91% of new US power capacity in the first quarter, and California's batteries met 36% of demand at one point in July

    23 Jul 2026

  71. Croatia's passenger railway will charge battery trains at a station with its own solar and storage

    16 Jul 2026

  72. Google booked the first two phases of America's largest solar-plus-storage build - and the box is part of the deal

    15 Jul 2026

  73. Croatia's regulator says the battery rulebook follows a new power law this autumn, with better terms from early 2027

    8 Jul 2026

  74. INA finished 11 MW of solar inside its Rijeka refinery, and the power is for a hydrogen machine

    2 Jul 2026

  75. Croatia opened its first household battery grant. The workplace lesson sits next door in the business call.

    30 Jun 2026

  76. Croatia finally priced the grid hook-up. Hybrid solar-plus-battery sites now pay on the higher of import or export.

    25 Jun 2026

  77. A Medulin tourism site is building 5 MWp of solar and a 5 MW / 10 MWh battery on an old clay pit

    29 May 2026

  78. Croatia's distributor named three ways to connect a battery. Co-located storage still may not charge from the grid.

    22 Jan 2026